Retail

737 Park Place

Four-Story, Two-Family Mixed-Use Building Coming to 737 Park Place, Crown Heights

Itamar Bruhim, doing business as an anonymous Floral Park-based LLC, has filed applications for a four-story, two-unit mixed-use building at 737 Park Place, in western Crown Heights, located five blocks from the Franklin Avenue stop on the 2/3/4/5 trains. The structure will measure 4,378 square feet, and 1,254 square feet of that will be dedicated to ground-floor retail space. Above, one unit will be hosted on the second and third floor, and a second unit will be located in the fourth floor and penthouse level. The apartments should average a spacious 1,612 square feet, which means condominiums must be in the works. Roman Sorokko’s Little Neck-based Versatile Engineering is the applicant of record. The 20-foot-wide, 1,513-square feet lot is currently vacant.


730 Fifth Avenue

Office-to-Luxury Hotel-Residential Conversion Planned at Crown Building in Midtown

In early 2015, Wharton Properties and General Growth Properties (GGP) acquired, for $1.75 billion, the Crown Building – a 25-story, 385,600-square-foot multi-use commercial building – at 730 Fifth Avenue, located on the corner of West 57th Street in Midtown. Now, it’s been disclosed that developer Michael Shvo and Russian investor Vladislav Doronin are planning to acquire a large portion of the building for a mixed-use conversion project, the New York Post reported. The duo want to convert the upper floors of the current office building into an Aman hotel and 23 ultra-luxury condominium units. Wharton and GGP recently bought out the last remaining office tenant. The current owners plan to lease the remainder of the property that isn’t sold to Doronin and Shvo as retail. The retail space is currently being newly renovated and is expected to take up at least the first four above grade levels. Late last year, it was reported that Bulgari signed a 15-year lease on the ground floor.

Read More


587-591 Third Avenue

20-Story, 74-Unit Mixed-Use Project at 591 Third Avenue in Murray Hill Could Be Condos

Back in March of 2015, CB Developers, SK Development, and Ironstate Development acquired, for $25.2 million, the three five-story tenement buildings at 587-591 Third Avenue, located between East 38th and 39th streets in Murray Hill. Around that time, the developers filed applications for a 20-story, 74-unit mixed-use building at the site. Now, the team has submitted preliminary applications (called CPS-1 documents, which are associated with marketing) with the state Attorney General’s office for a condominium project, according to The Real Deal. Filings with the Buildings Department describe a 96,166-square-foot building in the works. It will have 4,231 square feet of retail space on the ground and cellar levels, and its residential units should average 972 square feet apiece. Edgar L. Rawlings’ Lower East Side-based Rawlings Architects is the architect of record. Demolition permits were filed for the existing tenements back in 2014.


613 Baltic Street

11-Story, 44-Unit Mixed-Use Condo Project Rises to Fifth Floor at 613 Baltic Street, Park Slope

Back in December of 2015, updated renderings were revealed of the 11-story, 44-unit mixed-use building under development at 613 Baltic Street, in northern Park Slope, located six blocks south of the Atlantic Avenue-Barclays Center stop on the D/N/R trains. Now, construction is underway on the fifth floor of the structure, as seen in a photo by our friend Tectonic. The structure, dubbed the Baltic, will encompass 83,154 square feet, and will include 3,157 and 2,163 square feet of retail and community facility space, respectively, on the ground floor. The residential units will be condominiums, averaging 1,339 square feet apiece, and two- and three-bedroom apartments are currently on the market. Amenities include a fitness center, landscaped gardens and terraces, a roof deck featuring lounges, grills, and dining areas, a movie theater, storage for 22 bikes, and a 10-car garage in the cellar. JDS Development Group is the developer and VOA Architecture is behind the design. Completion is expected in 2017.


Fetching more...