Retail

1179 Second Avenue

32-Story, 83-Unit Mixed-Use Tower Filed at 249 East 62nd Street, Upper East Side

Florida-based Real Estate Inverlad Development and South Carolina-based Third Palm Capital have filed applications for a 32-story, 83-unit mixed-use tower at 249 East 62nd Street, located in the Lenox Hill section of the Upper East Side. The new building would encompass 145,130 square feet and stand 510 feet in height. Retail space will measure 2,561 square feet across the ground and cellar levels, followed by 83 residential units across the ground through 29th floors. The apartments should average 1,188 square feet apiece. Rafael Viñoly’s Hudson Square-based architecture firm is the architect of record, the Real Deal reported. The 8,765-square-foot site is presently vacant.


302 Broadway

Six-Story, 18-Unit Mixed-Use Building Filed at 302 Broadway, Williamsburg

Brooklyn-based property owner Kazi Billah has filed applications for a six-story, 18-unit mixed-use building at 302 Broadway, located on the corner of Marcy Avenue in the heart of Williamsburg. The project will measure 26,070 square feet and rise 65 feet to its roof. There will be 5,790 square feet of ground-floor retail space, followed by 5,790 square feet of medical offices on the second floor. There will be 18 residential units, averaging 805 square feet apiece, across the fourth through sixth floors. A 12-car garage will be located on the third floor.



238 West Fort Lee Road

Six-Building, 421-Unit Mixed-Use Project Approved at 238 West Fort Lee Road, Bogota, N.J.

The Bogota Planning Board has approved a 421-unit mixed-use project proposed on the 14-acre development site at 238 West Fort Lee Road, along the Hackensack River in the Bergen County, N.J., borough of Bogota. Dubbed The River Club, the project will feature six residential buildings, each to rise either four or five stories in height. Ten percent, or 42 apartments, will be designated as affordable housing, Jersey Digs reported. There will also be retail space along West Fort Lee Road, as well as a two-story clubhouse and a 2,200-foot-long riverfront promenade. River Development is the developer and B&R Engineering is responsible for the infrastructure work. C-I Design Inc. is the architect. Ground breaking is expected next year, with completion anticipated by 2020.



Fetching more...