Construction Update: Fulton Center
Exterior work is wrapping up on Fulton Center, which is looking better and better as it approaches completion – opening is slated for 2014. Even in the summer, much of the building is stuck in…
Exterior work is wrapping up on Fulton Center, which is looking better and better as it approaches completion – opening is slated for 2014. Even in the summer, much of the building is stuck in…
Excavation for the 21-story sliver tower at 19 Park Place – aka the Tribeca Royale – is underway, and foundation work on the project looks like it should be starting shortly. Equipment is active on…
The superstructure of 56 Leonard Street is at the tower’s fifth floor, though the pace of construction has apparently lagged behind schedule due to unforeseen difficulties surrounding the Herzog & de Meuron-designed tower. Construction will…
Excavation is in full swing at The Sterling Mason, located at 71 Laight Street, which will mix the facade of a preserved warehouse with new construction. The building’s architect is Morris Adjmi, which delivered on…
Excavation is in full swing at 460 Washington Street, which will soon be occupied by a 10-story building. Permits filed with the Department of Buildings indicate the developer is Related and the architect is Ismael…