Residential

227 West Street’s Stepped and Cantilevering Towers Top Out in Greenpoint, Brooklyn

Construction has topped out on 227 West Street, a pair of 30- and 40-story residential towers in GreenpointBrooklyn. Designed by OMA with Beyer Blinder Belle as the architect of record and developed by Brookfield Property Partners and Park Tower Group, the 450- and 351-foot tall towers are part of the 22-acre Greenpoint Landing development along the East River. James Corner Field Operations is the landscape architect, DeSimone Consulting Engineers is the structural engineer, Thornton Tomasetti is the façade consultant, and Highbury Concrete is responsible for building the superstructures.

Read More


9 DeKalb Avenue’s Superstructure Soars Past Halfway Mark in Downtown Brooklyn

Construction has passed the halfway mark on 9 DeKalb Avenue, a 73-story residential skyscraper in Downtown Brooklyn and the Outer Boroughs’ first supertall at 1,066 feet tall. Designed by SHoP Architects and developed by JDS, the tower will soon eclipse the 720-foot-tall architectural height of Kohn Pedersen Fox’s Brooklyn Point to secure the title of the tallest building in Brooklyn. 9 DeKalb Avenue will yield a total of 425 rental apartments and 150 condominiums.

Read More

45-30 Davis Street’s Excavation and Pilings Begin in Long Island City, Queens

Excavation is underway at 45-30 Davis Street, the site of a 20-story residential tower in Long Island City, Queens. Designed by Marvel Architects and developed in a joint venture between ZD Jasper Realty and Ascent Development, the 136,648-square-foot structure will stand 300 feet tall and yield 13- condominiums and 15 parking spots on the first floor. The site is located off Jackson Avenue between Pearson Street and Davis Street, a short walk from the Court Square station that services the 7, E, M, and G trains.

Read More

YIMBY’s 2021 Q1 Report Shows 3,566 New Residential Units Filed from January through March

Filing statistics for the first quarter of 2021 are in, and New York YIMBY has prepared a detailed report that analyzes the findings. During the period from January through March, applications were filed for 3,566 new residential units across the five boroughs. Compared to the first quarter of 2020, the number of buildings filed dipped slightly in January (from 163 in 2020 to 135 in 2021) and negligibly in February (from 158 in 2020 to 158 in 2021). The unexpected surprise came in March, when a total of just six new building applications were filed over the course of the month, which is a collapse compared to the 147 filings registered in March of last year. However, many of the projects filed for during this period were conceived during the height of local and global economic uncertainty. In addition, in early March of 2021, the city implemented a moratorium on permit filings for properties that had unresolved violations, which may have further deflated the total number of new buildings filed. The full Excel spreadsheet of all Q1 2021 applications is available with purchase of the Building Wire subscription.

Read More

Fetching more...