489 Baltic Street, rendering by Gradient Architecture Studio

Revealed: Baltic Huis, Boerum Hill Hotel at 489 Baltic Street

Just like Brooklyn’s other trendy industrial zones in Bushwick and Williamsburg, the M-1 zone around the Gowanus Canal has become a breeding ground for boutique hotels. The developer of the nearby Union Hotel filed plans last year for a second hotel at 489 Baltic Street, on the border between Gowanus and Boerum Hill. Now YIMBY has renderings for the four-story project between Bond and Nevins Streets.

Read More

Hudson Yards, image from Related

Thomas Heatherwick’s Hudson Yards Sculpture Now Under Construction

According to The New York Times, UK-based Thomas Heatherwick’s Hudson Yards centerpiece is now under construction. A source who has seen the design described it as resembling the shape of a chalice, rising higher than the 100-foot-tall Culture Shed, which YIMBY unveiled in 2013. The sculpture does not require public review, and Related Companies and Oxford Properties are developing.


2255 Broadway

New Building Likely Planned At 2255 Broadway, Upper West Side

The three-story commercial building spanning 2251-2259 Broadway, at West 81st Street on the Upper West Side, is expected to be demolished to make way for a new development, according to West Side Rag. The retail tenants are currently in the relocation process, and developer Alchemy Properties is leasing the property from the owner. Building applications and demolition permits have not been filed yet, although the property’s unused air rights were subdivided from the existing structure in April.



231 East 123rd Street

Six-Story, 11-Unit Residential Building To Replace Townhouse At 231 East 123rd Street, East Harlem

Big Brooklyn Rehab Inc. has filed applications for a six-story, 11-unit residential building at 231 East 123rd Street, in East Harlem, four blocks from the 125th Street stop on the 4, 5 and 6 trains. The building will measure 8,670 square feet, which means units will average 790 square feet — probably rentals. Woody Chen’s Infocus Design & Planning is the applicant of record, and the existing three-story, three-family townhouse must first be demolished.