Ridgewood


976 Cypress Avenue

Four-Story, 108,200 Square-Foot Self-Storage Facility Coming To 976 Cypress Avenue, Ridgewood

Chicago-based self-storage company LSC Development has filed applications for a four-story, 108,200-square-foot self-storage facility at 976 Cypress Avenue, in southern Ridgewood, located about two blocks from the Halsey Street stop on the L train. The planned structure will replace a single-story warehouse structure on the corner of Centre Street. The facility will have an accessory office space and will feature two loading berths. Long Island-based Frank Relf is the architect of record. Demolition permits were filed in January to remove the existing warehouse building.


1732 Hancock Street

Five-Story, 11-Unit Mixed-Use Building Filed At 1732 Hancock Street, Ridgewood

Brooklyn-based Bawabeh Brothers has filed applications for a five-story, 11-unit mixed-use building at 1732 Hancock Street, in southern Ridgewood, located seven blocks south of the Seneca Avenue stop on the M train. The entire structure will measure 24,825 square feet in total, 12,596 square feet of which will be for a dialysis center located on the ground and second stories. On the rest of the second floor and on the upper levels, there will be a total of 11 residential units averaging 931 square feet apiece. Rego Park-based Diego Aguilera Architects is the applicant of record. The 8,009 square-foot lot is currently being used for parking.



475 Woodward Avenue

Four-Story, Seven-Unit Residential Building Coming To 475 Woodward Avenue, Ridgewood

Joseph Deutsch, doing business as an anonymous LLC, has filed applications for a four-story, seven-unit residential building at 475 Woodward Avenue, in Ridgewood, located 10 blocks northwest of the Forest Avenue stop on the M train. The entire building will measure 6,526 square feet in total, but residential units will spread across 4,996 square feet of space. That means average configurations of 714 square feet apiece, indicative of rentals. Oleg Ruditser’s Brooklyn-based M.E.P. Designs Inc. is the applicant of record. Permits to demolish the existing two-story house were filed in December.


Fetching more...