Construction Update

125 Greenwich Street - Rendering by March

YIMBY Visits 125 Greenwich Street’s Sales Gallery On One World Trade Center’s 84th Floor

Last month, YIMBY toured the sales gallery for 125 Greenwich Street as the first in a series of skyline updates going live this week. Construction is moving quickly, and last we saw, the tower had risen over two-dozen floors, and nearly 300 feet, above ground. That leaves plenty of height left to grow before it makes an impact on the Lower Manhattan skyline. Famed architect Rafael Viñoly is responsible for the design.

Read More

53W53 from 5th Avenue, image by Andrew Campbell Nelson

YIMBY Scopes 53 West 53rd Street’s Perspectives Above the Midtown Plateau

For the second day of 2018’s Skyline Week, YIMBY has photos from the top of 53 West 53rd Street, aka 53W53, which has been talked about for longer than any other skyscraper currently under construction in New York City. The supertall has been eleven years and a controversial 200-foot height reduction in the making. The tower will yield condominiums, galleries, and a restaurant, and its kinetic dark façade matches the vibrant energy of the Midtown streets below, with crisscrossing diagrid lines careening from the base up toward the spearheaded peak. The structure is on its way to a 1,050-foot pinnacle, which will handily pierce the surrounding plateau of 700 to 800-foot rooftops.

Read More

56 Leonard Street

YIMBY Visits 56 Leonard’s Penthouse in Tribeca

The 2010s have seen an unprecedented number of new skyscrapers pierce the Manhattan skyline. This week, YIMBY will tour six of the tallest developments currently under construction and recently completed, starting with what may now be the most iconic structure in Tribeca, at 56 Leonard Street. Today, we have a look at the views offered from its uppermost penthouse, from approximately 800 feet above street level.

Read More

50 Hudson Yards

Excavation Wraps for Foster + Partners’ 50 Hudson Yards as Foundation Work Begins

Excavation at 50 Hudson Yards is nearing completion, and thanks to an aerial by Archartdescon, we can see that foundation work has also now commenced. Construction is advancing with incredible speed, and most of the site has been cleared since YIMBY’s last report in November. The pace isn’t too surprising when one considers the several excavators operating simultaneously. Related Companies is responsible for the Hudson Yards development.

Read More


Fetching more...